Projects

For client Costain, on behalf of Welsh Government we recently installed two preassembled braced pairs.

  • 100 tonnes of weathering grade steel
  • 500 tonne crane used to install two preassembled braced pairs
  • 30 metres long

Check out these before and after pictures: