Olympic Stadium

Olympic Stadium

We were tasked to replace and strengthen existing columns within the Olympic Stadium.

44 out of 56 columns required replacing and 4 more required strengthening with over plating
and filling with concrete. Over 500 locations within the stadium required strengthening work.
We carried out this out with over 100 men working in various areas.

Our men worked in purpose made scaffold enclosures carrying out blasting work,
NDT inspecting & welding. Installation of new rear and front roof steelwork were required,
comprising 4000 tonnes of new steelwork, achieving the largest open stadium roof span in the world.

 

6

Paddington

Paddington

Our No.4 Kingdom Street project comprises of a basement and a ten storey steel frame
with composite decked floor. This will provide a commercial building which will provide
13,700m2  of efficient and flexible commercial office space which is all supported from
the existing “Cross Rail Box” structure.

2

Queen Elizabeth Park Transformation Project

Queen Elizabeth Park Transformation Project

We were awarded a subcontract by BAM Nuttall to construct Bridge Y04 in the north of the Olympic Park near the Velodrome. Bridge Y04 is a 46 metre long truss bridge and will form part of a future cycleway. 35 metres of the bridge members were available from the deconstructed Bridge T12 which formed access into the Olympic Park during the Games over Stratford High Street, the additional 11 metres of the structure had to be fabricated from new steel. This project is one of the best examples of the re-use of infrastructure assets as part of the Olympic Legacy.

3

Birmingham New Street Station

Birmingham New Street Station

The installation of primary steelwork and supply and install ancillary steelwork for VolkerFitzpatrick

1

Crossrail Bond Street Western Ticket Hall

Crossrail Bond Street Western Ticket Hall

To supply technical supervision, management and independent inspection services for the top down construction of the new Bond Street Station as part of the Crossrail project. 101 steel collars were required to be welded to 600x600mm jumbo section in order to fix reinforcement from the concrete slab. In addition we installed temporary plate girders at ground level to provide a hanging support for the ongoing slab construction.

 

2

Portsmouth Coil Drums

Portsmouth Coil Drums

Our task was to assemble, weld and install two no coil drums for the MTL Group in Portsmouth for Pipecoil Technology and Magma Structures. Each drum consisted of four equal quarters each weighing 7.5 tonnes.

 

2

Hammersmith Flyover Strengthening – Phase 2

Hammersmith Flyover Strengthening – Phase 2

To supply all necessary works to complete 5 No. pier openings on the Hammersmith Flyover Strengthening Phase 2 Project. The works included supply and installation of strengthening steelwork, concrete drilling and coring and grouting of the steelwork into position. We provided temporary works solutions and supplied all project management, risk assessments and method statements for our works.