Olympic Stadium
Olympic Stadium
We were tasked to replace and strengthen existing columns within the Olympic Stadium.
44 out of 56 columns required replacing and 4 more required strengthening with over plating
and filling with concrete. Over 500 locations within the stadium required strengthening work.
We carried out this out with over 100 men working in various areas.
Our men worked in purpose made scaffold enclosures carrying out blasting work,
NDT inspecting & welding. Installation of new rear and front roof steelwork were required,
comprising 4000 tonnes of new steelwork, achieving the largest open stadium roof span in the world.